Customer case abouttropicana processing plant hpgr

tropicana processing plant hpgr

FIRST YEAR OF OPERATION OF HPGR AT TROPICANA

2020-3-17  Pilot plant scale test work summary and HPGR size selection is compared with actual operation results. In summary, the HPGR reached full operational capability within days of commissioning. This operational availability of the HPGR contributed to a quick ramp up of the entire plant that was achieved within weeks of commissioning. By February 2015

RAPID RAMP-UP OF THE TROPICANA HPGR CIRCUIT

2014-10-1  The 5.5 Mtpa Tropicana Gold Project in Western Australia adopted a HPGR ball mill comminution circuit due to the high cost of power generation and to reduce its energy footprint in line with its environmental operating licence. In order to maximise the benefit from the HPGR, closed circuit operation with wet screening at 4 mm was selected.

Operations Tropicana Joint Venture

Late in 2018 a second ball mill was added to the Tropicana processing plant increasing throughput capacity to more than 8 Mtpa, and providing flexibility to balance throughput and recovery. The modern processing plant uses conventional carbon-in-leach technology and includes high pressure grinding rolls (HPGR) for energy-efficient comminution.

Tropicana Gold Mine thevault.exchange

Tropicana Gold Project processing plant HPGR ROM Primary Crusher Emergency Stockpile Ball Mill Offices HV Workshop PowerStation Mining Area Secondary Crusher Tropicana-Havana resource growth Open Pit Proved and Probable Ore Reserve (Dec 2010): 48 Mt @ 2.2 g/t for 3.4 Moz* Mineral Resource (Dec 2010): 76.5 Mt at Open Pit Reserve & 2.15 g/t for

Hpgr Indonesia Plant T Vision-Balance-Pilates

2018-7-6  Tropicana processing plant hpgr. Hpgr indonesia plant tthebushlodge. tropicana processing plant hpgr. The processing plant is designed to operate at 30 000 td capacity with an availability of 92 . Results of the tradeoff study indie that the appliion of HPGR s to the Morrison project would result in significant operational cost savings in the

Major Mines & Projects. Tropicana Mine

2019-6-5  The HPGR operates in closed circuit with wet screens. The design includes the ability to continuously divert a fraction from the HPGR discharge to create a HPGR fines emergency stockpile. This stockpile is then reclaimed using a front-end loader to feed the wet screens when the HPGR or secondary crushing plant is off-line.

Recent Improvements in the Milling Circuit at Tropicana

2014-10-1  portion of fines in the HPGR product which could potentially impact either ball mill grind and/or power consumption. The result was that the HPGR–ball milling circuit remained the preferred option for the Tropicana project. The laboratory HPGR test work was completed by Polysius on a pilot scale HPGR with a 500 mm diameter and 300 mm width.

High-Pressure Grinding

2020-3-17  The use of HPGR machines in minerals processing plants requires special attention to these issues: » Pilot plant HPGR tests are necessary to evaluate the ore performance and to assess process and energy effiencyci » Careful assessment of ore body and definition of best/ worst-case scenarios

(PDF) High pressure grinding rolls scale-up and

2010-1-1  HPGR grinding is a technique whereby a fl ow of coarsely pre-crushed ore particles, presently near. 60 mm top size, is fi nely ground between

High Pressure Grinding Rolls (HPGR)

2016-7-13  Mine Operations Using HPGR • Freeport McMoran, Cerro Verde, Peru 2.4 m Dia x 1.7 m wide, 5 MW (2x2.5), processing 2,500 tph • Freeport McMoran, Grasberg Mine, Irian Jaya, Indonesia 2.0 m Dia x 1.8 m wide, 3.6 MW, processing 1,450 tph • Nurkazgan Gold, Kazakhstan 1.7 m Dia x 1.4 m wide, 2.3 MW, processing 1,000 tph

TROPICANA

Tropicana, Havana and Boston Shaker pits during the year. In the last quarter of 2016, a Caterpillar 6060, 600-tonne class shovel was introduced to the open pit mining fleet at Tropicana to increase mining rates to an annualised rate of 80 Mtpa and to better match the higher throughput requirements of the processing plant.

Tropicana Gold Mine Optimisation Project Mintrex

2019-8-26  to more than 2 years for the HPGR feed bin, driven primarily by the redesign of the bin discharge geometry. The result was a reduction in shutdown duration and an increase in plant utilisation which, combined with the optimisation of other equipment, increased the overall plant utilisation to >95% from 90%, with significant associated cost savings.

First year of operation of HPGR at Tropicana Gold

Pilot plant scale test work summary and HPGR size selection is compared with actual operation results. In summary, the HPGR reached full operational capability within days of commissioning. This operational availability of the HPGR contributed to a quick ramp up of the entire plant that was achieved within weeks of commissioning.

Geometallurgy at Tropicana: Mine to Mill Implementation

2015-9-15  Geometallurgy at Tropicana: Mine to Mill Implementation Peter Ketelaar,1,* Brad Catto,1 Michelle Carey,2 and Dave Lawie2 1Anglo Gold Ashanti, Level 13, 44 St. George’s Terrace, Perth, Western Australia 6000, Australia 2Imdex Ltd, 216 Balcatta Rd, Balcatta, Western Australia 6021, Australia *E-mail, [email protected] In the last few decades, there has been a lot of

Plant Optimisation Approach at the Tropicana Gold Mine

2019-11-22  maximising plant utilisation and throughput without increasing operating costs. At the Tropicana Gold Mine (AngloGold Ashanti Australia Ltd 70% and manager, Independence Group NL 30%), in Western Australia, considerable emphasis was placed on optimisation of the process circuit using operational data from the processing plant.

Tropicana Gold Mine MAY 2014 IGO Limited

processing plant optimisation . 10 hpgr, 30% installed power un-utilised . emergency ore upgrade completed 2015 . 14mw ball mill vsd operating at 15mw 2 x cil tanks to retain recovery at 30% lift in throughput screen optimised from 4mm to 3mm aperture conveyor upgrades

20150804 TJV Site visit clarification FINAL

on the HPGR surface twice as good as expected. AngloGold Ashanti expected the wear life for the HPGR to be about 7,000 hours, however the first change-out was at 14,000 delivering a significant benefit in reduced downtime and reduced cost. At the higher processing plant throughput rates and average reserve grade, the sustainable

Tropicana Gold Mine Project Centrals

The Scope of Work within the Treatment Plant Site includes construction of earthwork building pads, detailed earthworks and concrete installation of the Ball Mill Foundation & Pedestal and the Flotation Cell Foundations & Ring Beams within the Treatment Plant

IMPROVING PRODUCTIVITY IN PROCESSING

2018-2-20  Australia-Sunrise Dam Plant-Comminution circuit performance improvement-05-Jul2013 RS0-35 33 3 3 3 3 3 3 4 4 4 4 4 Sample processing, mass balancing and model fitting N Clarke 6-Dec-13 10-Dec-13 (HPGR) + Pebble Mill

Summary of Gold Plants and Processes ScienceDirect

2016-1-1  Summary of Gold Plants and Flow Sheets Discussed in Gold Ore Processing, Second Edition. Implemented with tube autoclaves 1.5 km long and 5 cm inner diameter. Leaching at ambient temperature and 5 MPa oxygen pressure and 0.2–0.5% NaCN; 15 min residence time for 85% recovery. Cyanide oxidation negligible.

Tropicana Gold Mine Optimisation Project Mintrex

2019-8-26  to more than 2 years for the HPGR feed bin, driven primarily by the redesign of the bin discharge geometry. The result was a reduction in shutdown duration and an increase in plant utilisation which, combined with the optimisation of other equipment, increased the overall plant utilisation to >95% from 90%, with significant associated cost savings.

Tropicana Gold Mine Site Visit Presentation

TROPICANA GOLD MINE DUNCAN GIBBS GENERAL MANAGER HPGR HPGR Feed Bin PLANT FLOWSHEET 2500tph Capacity Duty/Standby 41hr Residence 91% Recovery 5.8 Mt/a P(80) 75um PROCESSING MINE REPORTING SYSTEM . TROPICANA ANALYST VISIT 3RD March 2014 SLIDE: 30 SAGE 1. Permit to Work Request 2.

20150804 TJV Site visit clarification FINAL

on the HPGR surface twice as good as expected. AngloGold Ashanti expected the wear life for the HPGR to be about 7,000 hours, however the first change-out was at 14,000 delivering a significant benefit in reduced downtime and reduced cost. At the higher processing plant throughput rates and average reserve grade, the sustainable

First year of operation of HPGR at Tropicana Gold

Pilot plant scale test work summary and HPGR size selection is compared with actual operation results. In summary, the HPGR reached full operational capability within days of commissioning. This operational availability of the HPGR contributed to a quick ramp up of the entire plant that was achieved within weeks of commissioning.

Tropicana Gold Mine

Tropicana ramp-up 7 Ramp-up • 95% availability (design) achieved in March 2013 • Achieving throughput rate > 5.8 Mtpa (nameplate) Recovery • Consistent with Bankable Feasibility Study Plant cost • In line with estimates Production Q1, 2014 • In line with budget Processing flowsheet 8 Primary Crusher Coarse Ore Stockpile Secondary

Tropicana Gold Mine MAY 2014 IGO Limited

processing plant optimisation . 10 hpgr, 30% installed power un-utilised . emergency ore upgrade completed 2015 . 14mw ball mill vsd operating at 15mw 2 x cil tanks to retain recovery at 30% lift in throughput screen optimised from 4mm to 3mm aperture conveyor upgrades

Summary of Gold Plants and Processes ScienceDirect

2016-1-1  Summary of Gold Plants and Flow Sheets Discussed in Gold Ore Processing, Second Edition. Implemented with tube autoclaves 1.5 km long and 5 cm inner diameter. Leaching at ambient temperature and 5 MPa oxygen pressure and 0.2–0.5% NaCN; 15 min residence time for 85% recovery. Cyanide oxidation negligible.

(PDF) Real-time reconciliation of a geometallurgical

2018-3-14  At the Tropicana Gold Mine, Work Index estimates, derived from X-Ray Fluorescence and Hyperspectral scanning of Grade Control samples, are used to construct spatial GeoMetallurgical models (GeoMet).

ORWAY MINERAL CONSULTANTS PROCESS Mineral

2014-10-1  Page 2 of 22 PROCESS DESIGN REFERENCE LIST ORWAY MINERAL CONSULTANTS (WA) PTY LTD Level 4, 1 Adelaide Terrace, East Perth WA 6004, A.B.N 40 093 277 126

MetPlant 2017 AusIMM

The tenth in the series of conferences on Metallurgical Plant Design and Operating Strategies, was held from 11-12 September 2017 in Perth, Western Australia and presented an array of advances in metallurgical processing and plant design. The theme of World's Best Practice' was continued and papers explored the rising cost of energy and other consumables as the industry aims to optimise plant